Lab modifications included new lighting and lighting controls, new distribution, new fire alarm, new wiremold and power locations.
In 2016/2017 Long Electric was contracted to perform electrical construction to support the modifications of several lab spaces across two (2) floors at 95 Digital Drive, 300 Bel Marin Keys and 46 Galli Drive. Lab modifications included new lighting and lighting controls, new distribution, new fire alarm, new wiremold and power locations. All scope was performed within the project schedule and with no recordable lost time safety incidents.