Client: Gilead
Location: Foster City, CA
We take pride in knowing we are helping a company become more energy-efficient.
In 2020, Long Electric was hired to perform the electrical installation for a multi-building photovoltaic project at the Gilead Foster City campus. Scope included installation of new AC disconnects, panelboards, inverters, photovoltaic wire, terminations and testing. All work was completed within the project schedule and safely, with no lost-time incidents.