With many elements to the project, we are proud to have completed it on schedule and within budget.
In 2017, Long Electric contracted with Stion Corporation to perform the installation of a new 613.8 kW photovoltaic field at the Genentech facility in Dixon, CA. The project scope included the installation of AC and DC power system raceways, cabling and terminations, inverters, panelboards, AC disconnect, labeling, and testing. The project was completed on schedule, within budget and performed safely with no recordable lost time incidents.