This Desgin-Build project was completed safely and is currently under review for LEED Gold certification.
In 2016/2017, Long Electric teamed with Rudolph & Sletten to perform the build-out of a new Oncology and Infusion Clinic for Kaiser Permanente in San Rafael, Ca. The project scope included the design and build of new offices, exam rooms, pharmacy, and a new elevator in an existing two-story 11,000 sq. ft. building shell. Some of the electrical scope included: new power distribution, code-compliant lighting and lighting controls, security, fire alarm, sound masking, nurse call, public address system, and the installation of a new 150 kVa emergency generator. The delivery method for this project is Design-Build and Long Electric completed the project safely and with no recordable lost-time incidents. The project is currently under review for LEED Gold certification